While 3D BIM provides a highly detailed digital model of a building or facility, modern construction and operations demand more. By integrating additional dimensions—time (4D) and cost (5D)—BIM becomes a powerful forecasting tool, enabling real-time planning, scheduling, and cost analysis throughout a project’s lifecycle.
At ARY Engineering, we help companies move beyond static models, leveraging 4D & 5D BIM to enhance project efficiency, reduce risk, and optimize construction and facility management workflows.
Plan proactively instead of reacting to issues
Connect designers, contractors, and owners with shared real-time data
Reduce material waste and optimize scheduling
Ensure long-term operational success, not just construction efficiency
BIM isn’t just a design tool—it’s a strategic advantage. With 4D & 5D BIM, ARY Engineering helps construction firms, developers, and facility managers optimize workflows, reduce risk, and improve financial forecasting.
Let’s talk.
to future-proof your projects.