A Pacific Northwest manufacturer used ARY Engineering’s 3D Scan-to-Install workflow to replace a one-of-a-kind production module with zero fit-up issues.
Highlights:
- 120,000 sq ft scanned across production and utility areas
- $138K project ROI — investment recovered in under 3 months
- 3 vendor trips eliminated through virtual coordination
- 2-day outage avoided, saving $100K in downtime
- Faster prefabrication, safer installs, and precise, first-lift alignment
Download the full case study to see how 3D scanning prevented delays and rework during a critical equipment replacement.