CAD Drafting And BIM Modeling
ARY turns scans and old prints into current CAD drawings and Revit models.
Brownfield (Renovations)
Document Existing Conditions
ARY turns a 3D laser scan of the site into as-built CAD drawings, BIM models, P&IDs and digital twins that match what is actually built.
Ongoing Design Support
In-House Design Support
ARY designers join the client’s engineering team for in-house design production and overflow support.
Documentation Options
As-Built Plans
Facility layouts, evacuation plans and site drawings made from existing conditions.
Equipment Arrangements
Drawings that show where mechanical and electrical equipment sits and how much clearance it has.
BIM Models (Revit)
Revit models at LOD 100 to 300+ for facility management and coordination.
CAD-to-BIM Conversion
Old AutoCAD drawings rebuilt as organized Revit models.
Digital Twins
Interactive 3D models for remote facility management, asset tracking and capital planning.
Geometry Consolidation
Decades of prints combined into one organized, current drawing library.
P&IDs & Process Diagrams
Piping and instrumentation diagrams, process flow diagrams and system schematics for industrial facilities.
Configuration Management
Ongoing upkeep and version control of the client’s CAD and BIM drawing library as the facility changes.
CAD To BIM Conversion
ARY rebuilds old AutoCAD drawings as one organized Revit model, so the team can plan changes in 3D.
CAD vs BIM
| CAD | BIM | |
|---|---|---|
| What It Is | Lines and text on 2D sheets, such as plans and sections. | A 3D model where each wall, pipe and piece of equipment is an object. |
| Making Changes | Each sheet is updated by hand, one view at a time. | A change in the model updates every view that shows it. |
| Best For | Quick updates to a drawing set that already works. | Retrofits, clash detection and long-term facility management. |
What is CAD to BIM conversion?
CAD to BIM conversion rebuilds 2D AutoCAD drawings as a 3D Revit model, where each wall, pipe and piece of equipment is an object with its own data.
Does ARY scan the facility first?
When the drawings are old or incomplete, ARY scans the facility first, so the Revit model matches what is actually there.
What level of detail does ARY model to?
ARY models at LOD 100 to 300+, depending on how the client will use the model.
BIM Coordination
Clash Detection And Model Management
ARY runs clash detection across architectural, structural and MEP models and tracks each clash until it is resolved, so the design team can fix conflicts before they reach the field.
ARY works as a dedicated BIM coordinator on the client’s team or per project, in Navisworks, Revit or the client’s preferred platform.
What This Includes